Intellectual property for acquisition

Anonymous matching for European gas markets – patented, built and ready to transfer.

The complete Route4Gas intellectual property is available as one package: a granted US patent with its European family, an optimisation engine that turns hidden positions into swaps and EFP deals, and the 2026 software built for energy brokers.

Patents
US 11,838,348 B2

Granted in 2023, plus EP, PCT and NL filings. Protects anonymous matching under confidential credit limits.

Technology
Market-coupling engine

Finds swaps, EFP deals and multi-party loops across hubs, products and transport routes.

Software
Version 2026

Brokers as first-line users, today’s market topology, a new technology stack with AI modules.

The problem

Gas companies lose margin on deals that are never found

Matching positions exist across the market every day. Nobody sees them, because the data is split across systems and nobody wants to show it to competitors.

1

Liquidity gaps

In the morning, at lunch and at the end of the day liquidity drops: fewer counterparties, wider spreads, more expensive balancing.

2

Costly transport

Positions in different market areas are balanced by booking pipeline capacity – even when a swap with another company would make the transport unnecessary.

3

Confidentiality

Large positions and credit limits are commercially sensitive. Swaps and multi-party loops that would benefit everyone stay hidden.

The technology

One optimisation round: from hidden positions to executable deals

Participants submit encrypted positions and limits. The engine couples the markets and returns the set of bilateral deals that removes the most unnecessary transport and matches the most volume – within every participant’s credit limits.

Step 1

Participants

Traders, via their broker, submit positions, flows, storage and limits.

Step 2

SG360 layer

Limits are encrypted; identities are hidden – even from the operator.

Step 3

Optimisation engine

Couples markets and finds swaps, EFP deals and multi-party loops.

Result

Deals

Bilateral deals, executed by the broker.

Position typeWhat the engine does with it
Day-ahead positionsMarket coupling: a buyer in one area meets a seller in another
Existing flowsSwaps against flows already running, often with no new transport
Unused capacityCheaper routing via booked capacity that would otherwise stay idle
Storage positionsGas-in-store swaps: storage linked to any market area, without touching injection or withdrawal rates
“Missing link” tradesA third party closes an open loop and earns the spread
Counterflows and cyclic flowsOpposite and circular flows are netted out

Prices are fixed per round using a reference-hub methodology (live broker and exchange prices, spreads to the benchmark hub, outlier filtering). The same engine also runs internal optimisation across a company’s own desks, branches and storage.

Evidence

Before and after: one day of real capacity bookings

Historical simulation on PRISMA day-ahead bookings, H-gas, 1 March 2018. Flows were replaced by swaps, counterflows and missing-link trades.

Before optimisation
Map of European gas flows before optimisation
677 GWhabout €533k transport cost
After optimisation
Map of European gas flows after optimisation
527 GWhabout €389k transport cost
€0.15–0.65 / MWh

Additional margin for participants in backtests on historical data – from avoided transport and extra matched trades. On the example day: −150 GWh of transport and about −€144k in cost.

Backtests ran on the 2018–2020 market structure and describe historical simulations, not future results. Sources: Route4Gas backtests and analysis of PRISMA bookings.

SecureGateway360

Patented anonymity: compute under limits nobody can see

  1. Each participant sets limits for its possible counterparties and encrypts them twice – only a valid pair of participants can unlock a limit.
  2. Each participant sends its position together with a decryption key in an anonymous message.
  3. The server decrypts the limits, keeps only the pairs that verify, and computes the optimal solution within those limits.
Nobody sees a participant’s data – not even the platform operator.
  • Large positions are matched without moving the price
  • Credit limits stay confidential
  • Protected by US 11,838,348 B2 and the EP / PCT / NL family
Software version 2026

From a trader tool to broker infrastructure

1

Brokers as first-line users

The broker runs the platform and offers optimised deals to its traders. Traders can still use it directly; execution stays with the broker.

2

Focus on EFP deals

Exchange-for-Physical deals and multi-leg loops between traders across markets and tenors, built on the trading and credit limits they already have with each other.

3

Current market

Updated to today’s hubs and topology – for example the merged German market area Trading Hub Europe – and to LNG-driven flows.

4

New technology stack

Architecture rebuilt on a modern stack, with AI modules added to the optimisation workflow.

Patent portfolio

One patent family, three jurisdictions

System and method for implementing anonymously constrained computation in a distributed system. Priority date: 27 July 2018.

OfficeNumberFiledPublished / granted
USAUS 11,838,348 B229 Jul 2019 (PCT date)Granted 5 Dec 2023
EuropeEP 3 830 731 A129 Jul 2019Published 9 Jun 2021
PCTWO 2020/02290629 Jul 2019Published 30 Jan 2020
NetherlandsNL 202140927 Jul 2018Priority application

The US patent term runs to about July 2039, subject to maintenance fees. Full patent files are available to qualified parties under NDA.

The asset

What the buyer receives

All Route4Gas intellectual property in one transaction, free of the former corporate structure.

Patents

US, EP, PCT and NL family

Software

Version 2026, including source code

Algorithms

Optimisation engine and reference-price methodology

Know-how

Product, technical and market documentation since 2017

Brand

Route4Gas name and materials

Who can use it

Energy brokersEFP and swap matching as a new service
Trading venues and vendorsAnonymous multi-party matching in existing systems
Transmission and market operatorsFewer cross-border flows, better use of idle capacity
Large energy companiesInternal optimisation across desks and storage
Fintech and data companiesThe patented method in power and other commodities
History

Built with the market, backed by the industry

Developed in 2017–2022 by a team in Latvia and the Netherlands and tested with gas traders. Vier Gas Participation – part of the group that owns Germany’s leading gas transmission system operator – acquired 25% as a strategic shareholder.

2017Founded in Latvia; development starts
2018Dutch company; NL priority patent filing
2019PCT filing; trials with gas traders
InvestorVier Gas Participation (Germany) takes 25%
2022Market shock; operating companies wound down; IP acquired in full by a private owner
2023US patent granted
2026Software version 2026 completed
Request information

Interested in the Route4Gas IP?

Leave your details. We respond to qualified enquiries with the next steps and the information pack.

  1. 1
    Non-disclosure agreementSigned before any confidential material is shared.
  2. 2
    Technical demonstrationA live demo of the 2026 version.
  3. 3
    Due diligenceAccess to patent files and source-code review.